Andapa road construction monument
Revision as of 17:58, 5 September 2022 by 154.126.11.147 (talk)
Revision as of 17:58, 5 September 2022 by 154.126.11.147 (talk)
When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404 and at an altitude of 500 metres, a monument built by the Italian contractor that were constructing the road between Andapa and Sambava in mid-1960 can be seen.
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm-shaped part of the monument signifies the strength of the porters carrying heavy equipment and materials and the upwards pointing needle represents the way ahead.
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa.
The monument is located Between Masiaposa and Andrakata.