Changes

Andapa road construction monument

10 bytes added, 14:27, 5 September 2022
no edit summary
[[File:Sambava_to_Andapa_by_bike_047.jpg|600px]]
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm-shaped part of the monument signifies the strength of the men porters carrying heavy equipment and materials and the upwards pointing needle represents the way ahead.
{| class="imageTable"