Difference between revisions of "Andapa road construction monument"

From MadaCamp
Jump to: navigation, search
m (CampMaster moved page Hilltop monument to Andapa road construction monument without leaving a redirect: Text replacement - "Hilltop monument" to "Andapa road construction monument")
Line 32: Line 32:
 
}}
 
}}
 
</div>
 
</div>
 +
 +
== Further information ==
 +
 +
* [[Media:Andapa_road_construction_monument.zip|Andapa_road_construction_monument.zip]]

Revision as of 14:08, 5 September 2022

When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404 and an altitide of 500 metres, a monument built by the Italian contracter which began constructing the road between Andapa and Sambava in 1964 can be seen from the road.

Sambava to Andapa by bike 047.jpg

The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm shaped part of the monument signifies the men carrying equipment and materials and its upwards pointing needle represents the way ahead.

Andapa road construction monument 001.jpg
Andapa road construction monument 002.jpg Andapa road construction monument 003.jpg Andapa road construction monument 004.jpg

The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa. The monument is located Between Masiaposa and Andrakata.

Sambava to Andapa by bike 044.jpg

Loading map...

Further information