Difference between revisions of "Andapa road construction monument"
From MadaCamp
CampMaster (talk | contribs) (→Related information) |
CampMaster (talk | contribs) (→Further information) |
||
Line 34: | Line 34: | ||
}} | }} | ||
</div> | </div> | ||
+ | |||
+ | <gallery> | ||
+ | File:Andapa_road_construction_3.jpg | ||
+ | File:Andapa_road_construction_4.jpg | ||
+ | File:Andapa_road_construction_5.jpg | ||
+ | File:Andapa_road_construction_6-7.jpg | ||
+ | File:Andapa_road_construction_8.jpg | ||
+ | File:Andapa_road_construction_8a.jpg | ||
+ | File:Andapa_road_construction_8b.jpg | ||
+ | File:Andapa_road_construction_9.jpg | ||
+ | File:Andapa_road_construction_10.jpg | ||
+ | File:Andapa_road_construction_11.jpg | ||
+ | File:Andapa_road_construction_12.jpg | ||
+ | File:Andapa_road_construction_13.jpg | ||
+ | File:Andapa_road_construction_14.jpg | ||
+ | File:Andapa_road_construction_15.jpg | ||
+ | File:Andapa_road_construction_16.jpg | ||
+ | File:Andapa_road_construction_17.jpg | ||
+ | File:Andapa_road_construction_18.jpg | ||
+ | File:Andapa_road_construction_19.jpg | ||
+ | File:Andapa_road_construction_20.jpg | ||
+ | File:Andapa_road_construction_21.jpg | ||
+ | File:Andapa_road_construction_22.jpg | ||
+ | File:Andapa_road_construction_23.jpg | ||
+ | File:Andapa_road_construction_24.jpg | ||
+ | File:Andapa_road_construction_25.jpg | ||
+ | File:Andapa_road_construction_26.jpg | ||
+ | File:Andapa_road_construction_27.jpg | ||
+ | File:Andapa_road_construction_28.jpg | ||
+ | File:Andapa_road_construction_29.jpg | ||
+ | File:Andapa_road_construction_31.jpg | ||
+ | File:Andapa_road_construction_32.jpg | ||
+ | File:Andapa_road_construction_33.jpg | ||
+ | </gallery> | ||
+ | |||
+ | |||
== Further information == | == Further information == |
Revision as of 12:53, 13 September 2022
When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404 and at an altitude of 500 metres, a monument built by the Italian contractor that were constructing the road between Andapa and Sambava in mid-1960 can be seen.
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm-shaped part of the monument signifies the strength of the porters carrying heavy equipment and materials and the upwards pointing needle represents the way ahead.
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa.
The monument is located Between Masiaposa and Andrakata.
Loading map...
Further information