Andapa road construction monument
From MadaCamp
Revision as of 14:02, 5 September 2022 by CampMaster (talk | contribs) (CampMaster moved page Hilltop monument to Andapa road construction monument without leaving a redirect: Text replacement - "Hilltop monument" to "Andapa road construction monument")
When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404 and an altitide of 500 metres, a monument built by the Italian contracter which began constructing the road between Andapa and Sambava in 1964 can be seen from the road.
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm shaped part of the monument signifies the men carrying equipment and materials and its upwards pointing needle represents the way ahead.
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa. The monument is located Between Masiaposa and Andrakata.