When travelling to Andapa, slightly hidden from view, up and above the road to the left at 14°37'59.6"S 49°42'29.7"E, a large monument built by the Italian contracter that began constructing the road in 1964 can be seen.
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm shaped part of the monument signifies the lifting of materials and equipment and its upwards needle pointing represents the way ahead.
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa.
Loading map...
{"minzoom":false,"maxzoom":false,"mappingservice":"googlemaps3","type":"SATELLITE","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"width":"auto","height":"400px","centre":{"text":"","title":"","link":"","lat":-14.633217049969,"lon":49.708257842922,"icon":""},"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":true,"static":false,"zoom":15,"layers":[],"controls":["pan","zoom","type","scale"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"tilt":0,"imageoverlays":[],"kml":[],"gkml":[],"fusiontables":[],"searchmarkers":"","enablefullscreen":false,"locations":[{"text":"\u003Cp\u003E\u003Cb\u003EMonument\u003C/b\u003E\n\u003C/p\u003E","title":"Monument\n","link":"","lat":-14.633217049969,"lon":49.708257842922,"icon":""}]}