Difference between revisions of "Andapa road construction monument"

From MadaCamp
Jump to: navigation, search
m (CampMaster moved page Hilltop monument to Andapa road construction monument without leaving a redirect: Text replacement - "Hilltop monument" to "Andapa road construction monument")
 
(12 intermediate revisions by 2 users not shown)
Line 1: Line 1:
'''When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404 and an altitide of 500 metres, a monument built by the Italian contracter which began constructing the road between Andapa and Sambava in 1964 can be seen from the road.'''
+
'''When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404' and at an altitude of 500 metres, a monument built by the Italian contractor that were constructing the road between Andapa and Sambava in mid-1960 can be seen.'''
  
 
[[File:Sambava_to_Andapa_by_bike_047.jpg|600px]]
 
[[File:Sambava_to_Andapa_by_bike_047.jpg|600px]]
  
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm shaped part of the monument signifies the men carrying equipment and materials and its upwards pointing needle represents the way ahead.
+
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm-shaped part of the monument signifies the strength of the porters carrying heavy equipment and materials and the upwards pointing needle represents the way ahead.
  
 
{| class="imageTable"
 
{| class="imageTable"
Line 15: Line 15:
 
|}
 
|}
  
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa. The monument is located Between [[Masiaposa]] and [[Andrakata]].
+
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa.
  
 
[[File:Sambava_to_Andapa_by_bike_044.jpg|600px]]
 
[[File:Sambava_to_Andapa_by_bike_044.jpg|600px]]
 +
 +
The monument is located Between [[Masiaposa]] and [[Andrakata]].
  
 
<div style="max-width:600px;">
 
<div style="max-width:600px;">
 
{{#display_map:
 
{{#display_map:
-14.633217049969469,49.7082578429222~'''Monument'''~~;
+
-14.633217049969469,49.7082578429222~'''Andapa road construction monument'''~~;
 
|centre=-14.633217049969469,49.7082578429222
 
|centre=-14.633217049969469,49.7082578429222
 
|type=satellite
 
|type=satellite
Line 32: Line 34:
 
}}
 
}}
 
</div>
 
</div>
 +
 +
== Print brouchure scans ==
 +
 +
<gallery>
 +
File:Andapa_road_construction_3.jpg
 +
File:Andapa_road_construction_4.jpg
 +
File:Andapa_road_construction_5.jpg
 +
File:Andapa_road_construction_6-7.jpg
 +
File:Andapa_road_construction_8.jpg
 +
File:Andapa_road_construction_8a.jpg
 +
File:Andapa_road_construction_8b.jpg
 +
File:Andapa_road_construction_9.jpg
 +
File:Andapa_road_construction_10.jpg
 +
File:Andapa_road_construction_11.jpg
 +
File:Andapa_road_construction_12.jpg
 +
File:Andapa_road_construction_13.jpg
 +
File:Andapa_road_construction_14.jpg
 +
File:Andapa_road_construction_15.jpg
 +
File:Andapa_road_construction_16.jpg
 +
File:Andapa_road_construction_17.jpg
 +
File:Andapa_road_construction_18.jpg
 +
File:Andapa_road_construction_19.jpg
 +
File:Andapa_road_construction_20.jpg
 +
File:Andapa_road_construction_21.jpg
 +
File:Andapa_road_construction_22.jpg
 +
File:Andapa_road_construction_23.jpg
 +
File:Andapa_road_construction_24.jpg
 +
File:Andapa_road_construction_25.jpg
 +
File:Andapa_road_construction_26.jpg
 +
File:Andapa_road_construction_27.jpg
 +
File:Andapa_road_construction_28.jpg
 +
File:Andapa_road_construction_29.jpg
 +
File:Andapa_road_construction_31.jpg
 +
File:Andapa_road_construction_32.jpg
 +
File:Andapa_road_construction_33.jpg
 +
File:Andapa_road_construction_fr.pdf
 +
 +
</gallery>
 +
 +
== Further information ==
 +
 +
* [[Andapa]]
 +
* [[Sambava to Andapa by bike]]
 +
 +
 +
<!--* [[Media:Andapa_road_construction_monument.zip|Andapa_road_construction_monument.zip]]-->

Latest revision as of 14:20, 13 September 2022

When travelling to Andapa, up and above the road to the left at S 14°37.968' E049°42.404' and at an altitude of 500 metres, a monument built by the Italian contractor that were constructing the road between Andapa and Sambava in mid-1960 can be seen.

Sambava to Andapa by bike 047.jpg

The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm-shaped part of the monument signifies the strength of the porters carrying heavy equipment and materials and the upwards pointing needle represents the way ahead.

Andapa road construction monument 001.jpg
Andapa road construction monument 002.jpg Andapa road construction monument 003.jpg Andapa road construction monument 004.jpg

The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa.

Sambava to Andapa by bike 044.jpg

The monument is located Between Masiaposa and Andrakata.

Loading map...

Print brouchure scans

Further information