Andapa road construction monument

From MadaCamp
Revision as of 13:23, 5 September 2022 by CampMaster (talk | contribs)

Jump to: navigation, search

When travelling to Andapa, slightly hidden from view, up and above to the left of the road at 14°37'59.6"S 49°42'29.7"E, a large monument built by the Italian contracter that began constructing the road in 1964 can be seen.

The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm shaped part of the monument signifies carrying of materials and equipment and its upwards pointing needle represents the way ahead.

The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa. The monument is located Between [Masiaposa] and Andrakata.

Loading map...