Changes

Jump to: navigation, search

Andapa road construction monument

3 bytes added, 13:59, 5 September 2022
no edit summary
[[File:Sambava_to_Andapa_by_bike_047.jpg|600px]]
 
[[File:Sambava_to_Andapa_by_bike_044.jpg|600px]]
The road took six years to complete including the construction of heavy bridges crossing rivers and valleys. The circular arm shaped part of the monument signifies the men carrying equipment and materials and its upwards pointing needle represents the way ahead.
|}
The location served as a coffee stop for construction workers after having reached the road's peak coming from Andapa. The monument is located Between [[Masiaposa]] and [[Andrakata]]. [[File:Sambava_to_Andapa_by_bike_044.jpg|600px]] 
<div style="max-width:600px;">

Navigation menu