Difference between revisions of "Ravinala Airports"

From MadaCamp
Jump to: navigation, search
Line 1: Line 1:
Ravinala Airports is the company and project name for the reconstruction and management of two of Madagascar's international airports at IVATO and on Nosy Be island. The two airports received 845,000 and 147,000 passengers respectively in 2016.
+
'''Ravinala Airports is the company and project name for the reconstruction and management of two of Madagascar's international airports at IVATO and on Nosy Be island. The two airports received 845,000 and 147,000 passengers respectively in 2016.'''
  
 
<HTML5video type="youtube" width="600" height="338">p2zlv6f5d0M</HTML5video>
 
<HTML5video type="youtube" width="600" height="338">p2zlv6f5d0M</HTML5video>

Revision as of 09:37, 26 July 2017

Ravinala Airports is the company and project name for the reconstruction and management of two of Madagascar's international airports at IVATO and on Nosy Be island. The two airports received 845,000 and 147,000 passengers respectively in 2016.

The stakeholders of Ravinala Airports are: Group ADP (35%), the Bouygues group (20%), and Meridiam (45%). In cooperation with Meridiam, Colas Madagascar will oversee the operation as part of a 28 year contract held with the Government of Madagascar.

Ravinala Airports is overseeing the design, construction and operation during the first phase of the project.

At Ivato Airport in Antananarivo:

  • A new 17,500 m² international terminal with an initial capacity of 1.5 million passengers
  • Renovation of the existing domestic terminal
  • Complete resurfacing of the runway
  • Technical and environmental compliance of facilities

At Fascene Airport at Nosy Be:

  • Complete refurbishment of the runway and existing terminal, and the technical and environmental compliance of facilities.

Further information

https://globenewswire.com/news-release/2017/07/05/1039103/0/en/A%C3%A9roports-de-Paris-SA-Ravinala-Airports-the-concession-company-for-the-Antananarivo-and-Nosy-Be-airports-in-Madagascar-finalises-its-funding-arrangements-and-begins-work.html